Projects
NDRI conducts various projects related to interdisciplinary research and development. The projects can be grouped in four major areas as follows: Research on various issues; research projects are either initiated by NDRI itself or requested by other organizations. Consultancy services on various research and development works. Training and academic activities to help develop the human resources in various fields. Implementation of development activities in order to strengthen the knowledge base gained from such experiences.

1.Support for Strengthening Climate Finance Activities in Nepal

Technical Assistance:Climate and Development Knowledge Network (CDKN)
Collaborating Organizations :Prakriti Resources Center (PRC)
Start Date : February 2017
End Date : March 2017


Description :
The overall objective of this project is to support the Government of Nepal, particularly the Ministry of Finance as well as the Ministry of Population and Environment (MOPE) in enhancing their understanding and capabilities towards accessing and utilizing Climate Finance to implement climate actions in the country.


2. Baseline Survey of Maternal Neonatal Child Health and Nutrition (MNCHN)

Collaborating Organizations : Save the Children
Start Date : February 2017
End Date : March 2017


Description :
The project will be mainly focused on tangible MNCH deliverables for mothers and children through strengthening health system and community system at district level and below in 3 project districts-Jajarkot, Banke and Mahottari. The objective of this project is to reduce inequalities in health services, in particular to maternal, neonatal, child health (MNCH) and nutrition.


3.Not for Sale

Collaborating Organizations : Planete Enfants/Chhori
Start Date : January 2017
End Date : February 2017


Description :
The overall objective of this project is to reduce the risk of sexual exploitation and trafficking of women in the entertainment sector in Nepal through its empowerment and support activities.To measure the impact of these interventions against the project indicators, this impact study is carried out and will evaluate the quality of services provided to the targeted women, measuring their behavior/attitude change after receiving services through project interventions.


4.Community Perception Surveys for Inter Agency Common Feedback Project, UNRCO Nepal

Collaborating Organizations : UNDP/UNRCO
Start Date : December 2016
End Date : December 2017


Description :
The project aims to collect perceptions of earthquake affected people across 14 affected districts. These surveys will focus on perceptions related to services, people sense of agency, outcome and quality of relations between aid providers and the affected populations.Thematic perception will capture community feedback across critical themes; i) Reconstruction, ii) Food Security and Livelihood, iii) Protection.


5.National Assessment on Gender Equality and Knowledge Society

Collaborating Organizations : CCAFS
Start Date : December 2016
End Date : March 2017


Description :
This study is formulated to undertake national assessment of the status of women in national knowledge societies, with focus on their representation in science, technology and innovation (STI) systems. The overall objective of this research study is to create integrated database of women’s representation in various sectors such as health, social, economic, agriculture,opportunity and capabilities.


6.Community Based-Integrated Management of Neonatal and Childhood illness (CB-IMNCI) Programme Assessment

Collaborating Organizations : WHO
Start Date : October 2016
End Date : February 2017


Description :
This project aims to identify the gaps in the service, draw lessons and bring necessary modifications in the CB-IMNCI program (phases) in 6 project districts (Taplejung, Sindhupalchowk, Baitadi, Syangja, Nawalparsi, Saptari). The overall objectives of the project is to assess situation of service readiness in the health facilities for IMNCI services particularly focusing on sick young infants, to assess knowledge and skills of service providers for management of sick young infants, to assess volume of service provided to sick young infants and children aged 2-59 months in the last 3 months and explore reasons for low or no service offered by health facilities and reasons for reluctant to service delivery and to explore quality of service provided to the clients in terms of prescription of appropriate drugs, appropriate dosing, follow-up visits by clients, referral, clients compliance etc.


7.Baseline Study for Improved GBV Prevention and Response in selected Districts of Nepal

Collaborating Organizations : UNFPA
Start Date : October 2016
End Date : February 2017


Description :
The project aims to improve the capacity on four districts (Bajhang, Baitadi, Achham and Bajura) for providing a competent response to Gender Based Violence, including health and clinical services, professional referral to and from police, and shelter support including psychosocial counselling; to broadcast culturally appropriate radio messages regarding GBV, focused on an audience of men and boys, and to develop the capacity of local journalists and media organizations to report on GBV issues.


8. Baseline and endline survey in earthquake recovery districts:Assessing local governance

Collaborating Organizations : Sajhedaari Bikaas/PACT
Team Leader : Prof. Dr.Punya Prasad Regmi
Start Date : April 2016
End Date : June 2016


Description :
The main purpose of this project is to assess the recovery status, government response to citizen needs and the satisfaction level of citizen with service delivery of local government bodies in six highly affected districts from earthquake of April/May 2015 i.e. Gorkha and Lamjung of Western Development Region; and Dhading, Makwanpur, Dolakha and Ramechhap of Central Development Region.. The output gained from this research is expected to support the evidence based interventions in the affected districts through its strategic governance approaches.


Adaptation to Climate Change in the Hydroelectricity Sector in Nepal

Collaborating Organizations : Nepal Development Research Institute(NDRI), Global Climate Adaptation Partnership(GCAP), Practical Action Consulting Limited(PAC)
Funded By : Climate & Knowledge Development Network(CDKN)
Team Leader : Dr. Divas B. Basnyat
Start Date : February 2015
End Date : December 2016


Description :
This project studies the vulnerability of hydropower's system and develop the adaptation pathways based on the risk and uncertainty due to climate change and mainstream adaptation into the hydroelectric sector.


A Study on the impact of Nepal's earthquake on women's livelihood, housing, land & property rights and citizenship rights

Collaborating Organizations : UN Women
Team Leader : Dr. Manjeshwori Singh
Start Date : May 2016
End Date : September 2016


Description :
The overall objective of the project is to assess the impact of Nepal's earthquake, including the subesequent aftershocks, on the socio-econommic status of women in affected districts of Nepal. Its objective is to understand how the disaster has affected their lives and livelihoods but also how their socio-economic status, including issues related to rights to land, property and citizenship, has contributed or hindered their progress in recovering from the disaster.


Facilities Based Assessment for Reproductive Health,Commodities and Services - 2016

Collaborating Organizations : UNFPA
Team Leader : Dr. Basu Dev Pandey
Start Date : May 2016
End Date : October 2016


Description :
The overall objective of the project is to assess the number (percentage) of Service Delivery Points (SDPs) offering three and five modern methods of contraceptives including permanent method, the availability and stock out of seven life-saving maternal/RH medicines (Magnesium Sulphate and Oxytocin plus any other five) from the WHO list , including contraceptives in the public and private sector health facilities,supply chain management (including cold chain), availability and use of Information Communication Technology and method of waste disposal.


Evaluation of the Project for Agriculture Commercialization and Trade (PACT) in Nepal

Collaborating Organizations : SNPMC/NPC-UNDP
Team Leader : Prof. Dr. Punya P. Regmi
Start Date : April 2016
End Date : August 2016


Description :
The objective of the project is to enhance the competitiveness of those small farmers, agriculture cooperatives, bussinessman and enterpreneurs who are cooperated by the same project and are commercially important on the basis of agriculture yield-price series. It is targeted in six districts- Kathmandu, Rautahat, Syangja, Kapilbastu, Surkhet and Kailali.


Impact Survey of the Project Protection, Education and Livelihood in 8 Earthquake-affected VDCs of Nuwakot

Collaborating Organizations : Planete Enfants
Team Leader : Dr. Manjeshwori Singh
Start Date : February 2016
End Date : July 2016


Description :
The project aims at improving psychological well-being and economic reconstruction of earthquake affected communities within a protective environment. Divided into 2 phases, the first phase focuses on protection and education whereas the second phase focuses on livelihood support. The first phase has been completed whereby interventions like establishing TLC/CFS, FFS, Key life saving messages etc. has already been disseminated in 8 VDCs.


Impact Assessment Survey: Fish sub-sector; Seed and Feed intervention in Nepal

Collaborating Organizations : SAMAARTH
Team Leader : Prof. Dr. Punya P. Regmi
Start Date : November, 2015
End Date : December, 2015


Description :
The overall objective of the project was to produce robust, credible benchmark to assess the impact of the farmers who had accessed fingerling from those nurseries who gave specialized feed to the hatchling. The study was carried out in two districts-namely, Rupandehi and Nawalparasi.


Baseline Assessment Survey: Fish sub-sector; Better hatchery Management in Nepal

Collaborating Organizations : SAMAARTH
Team Leader : Prof. Dr. Punya P. Regmi
Start Date : November, 2015
End Date : December, 2015


Description :
The overall objective of the baseline was to produce robust, credible benchmark to assess the impact of the farmers who had accessed fingerling from those nurseries who gave specialized feed to the hatchling. The study was carried out in two districts-namely, Rupandehi and Nawalparasi.


Impact Assessment of Effectiveness of AICC's Communication Sources in Agriculture in Nepal

Collaborating Organizations : AICC
Team Leader : Dr. Nawa Raj Khatiwada
Start Date : May, 2015
End Date : September, 2015


Description :
NDRI is entrusted to breach the AICC' information gap on the impact of its radio, television and print media on its two main audiences: farmers and extension personnel. The study is aimed to supplement the invaluable data for determining the future direction of AICC, including its strategic planning exercises and proposed other programme. This study is the continuation of the similar study conducted in May-September 2014; The coverage districts are Lamjung, Udaupur, Nawalparasi, Sindhupalchowk and Morang for Phase I while Darchula, Dadeldhura, Surkhet, Bardiya and Dang are for Phase II.


Koshi Project Phase II

Collaborating Organizations : CSIRO
Team Leader : Dr. Laxmi Prasad Devkota
Start Date : December, 2014
End Date : July, 2015


Description :
This project, funded by Australian Government for improved trans-boundary water management in the South Asia region, tries to understand the accuracy of discharge estimates and possibility of its improvement for some locations of Koshi Basin of Nepal.


Facility based Assessment for Reproductive Health Commodities and Services

Collaborating Organisations : UNFPA
Team Leader : Dr. Basu Dev Pandey
Start Date : November, 2014
End Date : February,2015


Description :
The survey was to assess the service availability, distribution and stock-out of essential lifesaving RH commodities, including contraceptives, and other key issues related to family planning service delivery at public, private and NGO sectors health facilities across the country. The survey also collected necessary data to monitor progress on selected health system related indicators from NHSP II logical framework.


Koshi Project Phase I

Collaborating Organisations : CSIRO
Team Leader : Dr. Laxmi P. Devkota
Start Date : July, 2014
End Date : December,2014


Description :
The study is conducted in Bagmati Basin of Nepal, which is covered by eight districts viz. Bhaktapur, Lalitpur, Kathmandu, Kavrepalanchowk, Makwanpur, Sindhuli, Rautahat and Sarlahi, using HEC-RAS model.


Strengthening Generation and Dissemination of Climate based Agro-advisories for Small holder Farmers in South Asia

Collaborating Organisations : USAID/USA
Study Team : Prof. Dr. Punya Prasad Regmi
Start Date : May, 2014
End Date : May, 2015


Description :
In an effort to develop efficient mechanism of ICT incorporated agro-advisory service based on reliable and trusted sources and expertise, NDRI initiated this project with the support of USAID/DC. It envisions experience sharing and creating linkages with different institutions/organizations for scaling up climate services to smallholder farmers in Nepal. The usefulness of agro-meteorology advisories was increased with the technical expertise from India in order to enhance capacity, capabilities, and functionaries of farmers.


Assessment of Water Resources Management & Freshwater Biodiversity in Nepal

Collaborating Organisations : USAID Nepal
Study Team : Prof. Dr. Tara Nidhi Bhattarai, Dr. Nawa Raj Khatiwada
Start Date : June, 2014
End Date : September, 2014


Description :
The purpose of this Assignment was to conduct country-level water resources management and freshwater biodiversity analyses for Nepal that would inform USAID’s approach to natural resources management, including biodiversity conservation and climate change adaptation and mitigation, in Nepal for the five year period of 2015-2019.


Field Assessment for Community Resilience Program

Collaborating Organisations : Mercy Corps
Team Leader : Dr. Hari Dahal
Start Date : May, 2014
End Date : June, 2014


Description :
The study was undertaken to identify the major drivers of food and livelihood insecurity along with the social inclusion, gender equality, health, nutrition and sanitation situation in the selected five districts:Khotang, Sindhuli, Doti, Bajhang and Darchula, focusing primarily on climate vulnerable households and those affected by deep poverty and high rate of malnutrition.


Baseline Survey:Fish Sub-sector, Feed and Seed Intervantion in Nepal

Collaborating Organisations : SAMARTH-Adam Smith International
Study Team : Prof. Dr. Punya Prasad Regmi
Start Date : February, 2014
End Date : May, 2014


Description :
The survey was aimed to improve access of farmers to input, services and market through various intervention program -to assess the impact of quality seed and feed on fish production;to analyze the cost benefit ratio of fish intervention;to assess the level of knowledge of farmers on quality seed and feed utilization


Design and Conduct Formative to Guide UNICEF’s Comprehensive Communication for Development (C4D)

Collaborating Organisations : UNICEF
Team Leader : Dr. Nawa Raj Khatiwada
Start Date : January, 2014
End Date : June, 2014


Description :
The study was aimed to fulfill the objectives to contribute to identifying barriers and motivators to practicing recommended behaviours and social practices; identify opportunities and challenges in designing community led and owned communication interventions and participatory behaviour monitoring among different community groups; to gather information about the potential of harnessing interpersonal networks, traditional channels of communication, community radio, TV, mobile phones and internet-based social media in the C4D strategy, and to identify local capacity needs to be strengthened or developed and local interest in carrying out a community-led and owned communication program.


Baseline Survey for Electoral Support Project

Collaborating Organisations : UNDP
Team Leader : Prof. Dr. Punya Prasad Regmi
Start Date : November, 2013
End Date : March, 2014


Description :
The baseline survey had revealed general aspects regarding Voter’s Registration, Election and Voting, Constituency Assembly and Election and Voting Education which had immense implications in the elections to be held in future. Also, the roles and responsibilities of ECN staffs, training received and challenges faced by them were analyzed, the findings of which were used for the betterment of ECN.


Impact Assessment of National Integrated Pest Management (NIPM) Program: Consolidation, Up-scaling and Institutionalization Phase II in Nepal

Collaborating Organisations : FAO
Team Leader : Prof. Dr. Punya Prasad Regmi
Start Date : August, 2013
End Date : January, 2014


Description :
The study was carried out with a goal to contribute to sustainable, broad-based poverty reduction and food security, human health and environmental protection and assessed the impact in terms of household income, pesticide use, fertilizer use, and social aspects related to the behavior and attitude of the farmers and other stakeholders from 506 households constituting of FFS (203), NFFS(151) and Control (152) of five sampled districts, namely, Sarlahi, Bara, Arghakhanchi, Surkhet and Mustang.


Facility based Assessment for Reproductive Health Commodities and Services

Collaborating Organisations : UNFPA
Team Leader : Dr. Basu Dev Pandey
Start Date : December, 2013
End Date : May, 2014


Description :
The survey aims to assess the availability and stock out of RH commodities as well as provision of quality Family Planning (FP) services. Besides, the survey also addresses the supply chain, staff training and supervision, availability of guidelines and protocols, information communication technology, method of waste disposal and user fee.


Prioritization of Adaptation Options in Agriculture, ICT based Dissemination of Climate Information and Agro Advisories, and Yield Forecasting for Nepal

Collaborating Organisations : CCAFS/CGIAR
Team Leader : Prof. Dr. Punya Prasad Regmi
Start Date : April, 2013
End Date : December, 2013


Description :
To assess the challenges on agriculture and food security in Nepal under a changing climate and to explore new ways of helping vulnerable rural communities to adjust to the changes, project entitled “Prioritization of adaptation/ mitigations options in agriculture, ICT based dissemination of climate information and agro advisories and yield forecasting for Nepal”, in support of CCAFS (CGIAR) was undertaken in line with the CCAFS programme objectives.


Disaster Risk Reduction and Climate Change Adaptation in Koshi River Basin, Nepal

Collaborating Organizations : Climate Development and Knowledge Network (CDKN), Global Change SysTem for Analysis Research and Training (START)
Team Leader : Dr. Laxmi Prasad Devkota
Start Date : June, 2012
End Date : December, 2013


Description :
This project was conducted in Koshi River Basin, where climate change impact assessment was carried out to develop better understanding of impact of climate change and related stressors on the snowmelt process of mountains, rain-dominated hydrology of the hills and flood inundation pattern using hydrological and hydraulic models (SRM, SWAT, Hec-RAS). Moreover, for flood risk assessment, vulnerability assessment survey was conducted in sampled VDCs of Koshi basin to assess the demographic, economic, social, preparedness and recovery status of the people. Integrating social and technical component, a composite risk maps were prepared for existing historic and climate change conditions. Furthermore, review and gap analysis of existing policies and strategies was conducted and recommendations were provided on climate change adaption policies and strategies.


Food Security and Vulnerability to Climate Risk in Nepal: An online decision-support tool

Collaborating Organizations : International Center for Tropical Agriculture (CIAT)/Climate Change, Agriculture and Food Security (CCAFS)
Team Leader : Dr. Laxmi Prasad Devkota
Start Date : October, 2012
End Date : March, 2013


Description :
The study was aimed to produce an informative and easily accessible reference on risks due to climate variability and their current and potential impact on food security in Nepal, including a discussion of policy response options for adaptation and enhancing resilience. Major activities included: 1. Preparation of Annotated Bibliography of relevant research on food security and vulnerability to climate variability; 2. Assessment of climatic data required for the analysis of food security; 3. Analysis of climatic data and its relation with agricultural production and productivity and 4. Development of online decision support tool.


Field Survey on Poverty and Vulnerability Assessment in Nepal (PVAT)

Collaborating Organizations : ICIMOD Nepal
Team Leader : Prof. Dr. Punya Prasad Regmi
Start Date : April, 2012
End Date : July, 2012


Description :
The project on "Implementation of the Field Survey on Poverty and Vulnerability Assessment in Nepal (PVAT") in nine districts of Western and Far Western Region was implemented in partnership with International Centre for Integrated Mountain Development (ICIMOD). The main objective of this project was to identify existing poverty and vulnerabilities trends in selected district in Nepal at the household level in order to identify the most poor and vulnerable communities.


Vulnerability and Adaptive Capacity Assessment (VACA) under the Climate Change Adaptation Program

Collaborating Organizations : ICIMOD Nepal
Team Leader : Prof. Dr. Punya Prasad Regmi
Start Date : December, 2011
End Date : April, 2012


Description :
The project on " Vulnerability and Adaptive Capacity Assessment (VACA) under the Climate Change Adaptation Program (HICAP) was conducted in collaboration with International Centre for Integrated Mountain Development (ICIMOD). The main objectives of the work was to identify existing vulnerabilities and adaptive capacities at the community level in order to improve livelihoods and their resilience to climate and socio-economic changes.


Measuring Quality of Service Delivery through Sangini Franchising Outlet

Collaborating Organizations : AED
Team Leader : Dr. Basu Dev Pandey
Start Date : January, 2012
End Date :February, 2012


Description :
A project on Measuring Quality of Service Delivery through Sangini Franchising Outlet in partnership with AED. The main objective of the project is to increase the use of high quality family planning, reporductive health and maternal and child health products and services in 49 hill and mountain districts through private sector providers. This will contribute to the Government of Nepal's efforts to reduce the number of unwanted pregnancies and to improve maternal and child health.


Local Capacity Building for the Implementation of District Climate

Collaborating Organizations : AEPC
Team Leader : Dr. Divas B. Basnyat
Start Date : December, 2011
End Date : February, 2012


Description :
A project on Local Capacity Building for the Implementation of District Climate and Energy Plan in Illam District in partnership with Alternative Energy Promotion Centre/MoEnv.. The main objective of the project is to conduct capacity development training/orientations/tools/models to strengthen the capacity. of local stakeholders for the implementation of DCEPs in the districts.


Assessment of Flood and Inundation in Lower West Rapti River Basin under the effects of Climate Change

Collaborating Organizations : ICHARM Japan
Team Leader : Dr. Divas B. Basnyat
Start Date :June, 2011
End Date : January, 2012


Description :
The study "Assessment of Flood and Inundations under the Effect of Climate Change in Lower West Rapti River Basin in Nepal" in collabration with International Centre for Water Hazard and Risk Management (ICHARM) of Public Works Research Institute (PWRI) was of 8 months.


Baseline Survey for Country Strategic Plan

Collaborating Organizations : Plan Nepal
Team Leader : Dr. Punya Prasad Regmi
Start Date : May, 2011
End Date : July, 2011


Description :
A project Baseline Survey of Country Strategic Plan in partnership with Plan Nepal. The main objectives of the project is monitor and evaluate the outcomes of the programme in respect of its objectives and indicators and the intial and deswired situation will be defined in the indicators, against which the acheivement will be evaluated.


Quantitative Assessment of Livelihood Options depending on Biodiversity Services

Collaborating Organizations : ICIMOD Nepal
Team Leader : Prof. Dr. Punya Prasad Regmi
Start Date : April, 2011
End Date : June, 2011


Description :
The study "Quantitative Assessment of Livelihood Options depending on Biodiversity Services" was carried out in collabration with International Centre for Integrated Mountain Development (ICIMOD).


Environmental Impact Assessment, Nepal:Kohalpur-Mahendranagar 132kV Transmission Line

Collaborating Organizations : ADB
Team Leader : Dr. Nawa Raj Khatiwada
Start Date : September,2010
End Date : December, 2010


Description :
The project on "TA7176-NEP: Environmental Impact Assessment, Nepal:Kohalpur-Mahendranagar 132kV Transmission Line , Second Circuit Stringing", was carried out by NDRI in partnership with Asian Development Bank (ADB). (Effective from August 2010).


Enhancing Capacities for CCA and DRM for Sustainable Livelihoods in Agriculture Sector

Collaborating Organizations : UN FAO
Team Leader : Prof. Dr. Punya Prasad Regmi
Start Date : November, 2010-
End Date : December, 2010


Description :
The main objective of the project was livelihood profiling and vulnerability analysis related to natural local vulnerabilities, natural resources endowments, institutional setting, natural disaster prepardness strategies and local EWS to address climate risks based.


Conducting a beneficiary targeting study and pilot

Collaborating Organizations : UN WFP
Team Leader : Prof. Dr. Punya Prasad Regmi
Start Date : March, 2010
End Date : November, 2010


Description :
The main objective of the project, "Conducting a beneficiary targeting study and pilot" in partnership with UN-WFP (United Nation-World Food Program), is to conduct a base line survey for the target beneficiary of WFP Nepal. This project was conducted in 4 districts (Jajarkot, Banke, Kailali, Jumla) of Nepal.


Evaluation of Project on Rainwater Harvesting in Makwanpur

Collaborating Organisations : Plan Nepal
Team Leader : Dr. Nawaraj Khatiwada
Start Date : March, 2009
End Date : March, 2011


Description :
The project was initiated to implement a number of rainwater harvesting related intervention with an aim to improve living standard of families in Makwanpur, Nepal through promotion and adoption of rainwater harvesting practices and mainstreaming strategies that facilitate its adoption within wider water sector policies, through strengthening of the institutional and human resources capacities of the Nepali people to use rainwater harvesting. The objective of this evaluation was to identify outcomes of the project; to examine the effectiveness of the interventions, management practice, and implementation in general; and to investigate the potential for sustaining the activities that were implemented.


Assessment of Role of Community Forests (CFs) in CO2 Sequestration, Biodiversity, and Land Use Change

Collaborating Organizations : APN Japan
Team Leader : Dr. Chinta Mani Gautam
Start Date : August, 2009
End Date : July, 2010


Description :
The project on "Assessment of Role of Community Forests (CFs) in CO2 Sequestration, Biodiversity, and Land Use Change" was funded by Asia-Pacific Network Global Change Research (APN), Japan. The main objectives of the project are to estimate CO2 sequestration, to document species diversity in selected CFs and to analyze the role of CF in land use changes. The project was carried out in Terai and Hills Districts of Nepal .


Final Edition of National Energy Strategy Document

Collaborating Organizations : WECS-Govt of Nepal
Team Leader : Dr. Laxmi Prasad Devkota
Start Date : May, 2010
End Date : June, 2010


Description :
A project on Final Edition of National Energy Strategy Document in partnership with Water and Energy Commission Secretariat, Government of Nepal. The main objectives of the project is to edit preliminbary report.


Study on Transport Constraints in Western Nepal

Collaborating Organizations : DFID
Team Leader : Prof. Dr. Punya Prasad Regmi
Start Date : September, 2009-10
End Date : November, 2009


Description :
The project on "Study on Transport Constraints in Western Nepal", in partnership with Development for International, was to understand the dynamics of the road transport market in Western Nepal to inform research on high food prices.


Mapping Urban Slum Settlements of Kathmandu


Team Leader : Dr. Nawaraj Khatiwada
Start Date : June, 2009
End Date : August, 2009


Description :
The project was designed for mapping the slum areas and surveying the conditions of food insecurity and market prices in the urban slums of Kathmandu. For the implementation of the project, a spatial dataset through mapping satellite imagery of slum areas to represent patterns of growth of urban slums in Kathmandu was developed.


Karnali Employment Programme (KEP)

Collaborating Organizations : UN WFP
Team Leader : Prof. Dr. Punya Prasad Regmi
Start Date : April, 2009
End Date : May, 2009


Description :
The study of "Karnali Employment Programme (KEP) " was conducted by NDRI in partnership with World Food Programme (WFP) Nepal for International Labour Organization, Nepal. The study was conducted in order to derive lessons for future social protection and employment generation initiatives in Nepal. The study included a survey among 300 households, focus group discussions (FGDs), and VDC level interviews in 3 selected districts namely Humla, Jumla and Kalikot from Karnali Zone. Duly completed household survey questionnaires, digital files of the household questionnaires' data entered using WFP web-based input facility and summary reports on FGDs and of the basic VDC information/operation of KEP were the major outputs of the study.


Strengthening Local Capacities in Integrated Solid Waste Management (ISWM) in Small and Medium Municipalities of Nepal

Collaborating Organizations : Practical Action Nepal
Team Leader : Dr. Nawaraj Khatiwada
Start Date : March, 2009
End Date : April, 2009


Description :
The evaluation study was being conducted for and with the financial assistance of Practical Action Nepal. The main objectives of this study was to assess the effectiveness of the approaches and methods adopted in the project, evaluate the outcomes of the project, examine the strengths and weaknesses of the project approaches and interventions, and to draw up the lessons for improving the design and management of the future activities for sustainability as well as to suggest measures for improve planning and delivery of such programs.


Hazard and Vulnerability Mapping for DRM

Collaborating Organizations : UN FAO
Team Leader : Dr. Nawa Raj Khatiwada
Start Date : November, 2008
End Date : April, 2009


Description :
A project on Hazard and Vulerability Mapping, Documentation of Good Practice examples in Disaster Riska Management (DRM) and Climate Change Adaptation (CCA) in partnership with Food and Agriculture Organization of the United Nations. The main objective of the project is to provide technical support for carrying ouy hazard mapping (flood, drought and landslide), documentation of good parctices in Disaster Risk Management (DRM) and Climate Change Adaptation (CCA) in the selected pilot districts and VDCs.


Identification and rapid assessment of sub-basin (catchments) of the Karnali river basin

Collaborating Organizations : CWN
Team Leader : Prof. Dr. Punya Prasad Regmi
Start Date : December, 2008
End Date : March, 2009


Description :
The study on "Identification and rapid assessment of sub-basin (catchments) of the Karnali river basin". This project was implemented in partnership with Concern Worldwide Nepal. The main objective of this project was to identify sub-catchments, delineate catchments boundaries and river network in digital format of the Karnali River basin, conduct rapid assessment on selected catchments and enhance CWN and its partners' capacity on these aspects. The main activities carried out under the project were review of documents, consultation & sharing, collection of the documents, debriefing, set up digital information system, training/orientation, and report preparation.


Raising her voice

Collaborating Organizations : OXFAM
Team Leader : Dr. Nawa Raj Khatiwada
Start Date : December, 2008
End Date : March, 2009


Description :
The project on "Raising her voice" was supported by OXFAM in partnership with Women Security Pressure Group (WSPG). The main objective of this project was to develop a methodology to collect the baseline data to measure the agreed indicators as contained in the project log-frame.


Integrated Community Based Disaster Management in Banke District, Nepal Phase III

Collaborating Organizations : ICHARM Japan
Team Leader : Dr. Nawa Raj Khatiwada
Start Date : December, 2008
End Date : February, 2009


Description :
The study "Integrated Community Based Disaster Management in Banke District, Nepal Phase III". This project is a collaborative with International Centre for Water Hazard and Risk Management-Public Works Research Institute (ICHARM-PWRI), Japan. The duration of the study was 3 months and the field investigation was carried out in Banke district.


Developing Seamless Spatial Data Layers for Emergency Preparedness

Collaborating Organizations : UN WFP
Team Leader : Prof. Dr. Punya Prasad Regmi
Start Date : September, 2008
End Date : December, 2008


Description :
The project on "Developing seamless spatial data layers for emergency preparedness" was implemented in association with United Nations World Food Programme (WFP). The main objective of this project was to contribute towards emergency preparedness activities.


Review and Facilitation of Public Private Partnership (PPP) in the transport sector in Nepal

Collaborating Organizations : IMaCS
Team Leader : Prof. Dr. Punya Prasad Regmi
Start Date : April, 2008
End Date : November, 2008


Description :
The study on "Review and facilitation of public private partnership (PPP) in the transport sector in Nepal" was a World Bank funded project and implemented jointly by NDRI, Castalia Strategic Advisors, France and ICRA Management Consulting Services Ltd. (IMaCS), India. The main objective of the project was to determine the scope for structuring the proposed Kathmandu- Terai Fast Track Road Project as a Public Private Patnership (PPP) and delineate next steps.


Migration and Remittance during crisis

Collaborating Organizations : UN WFP
Team Leader : Prof. Dr. Punya Prasad Regmi
Start Date : September, 2007
End Date : October, 2008


Description :
The project on Migration and Remittances during Crisis:Implication for WFP response in partnership with World Food Program was carried out with the objectives to provide a key insights in migration patterns in Nepal. To supporting household food security and set of feasible recommendations.


Food assistance security for conflict affected populations in Nepal

Collaborating Organizations : UN WFP
Team Leader : Prof. Dr. Punya Prasad Regmi
Start Date : September, 2007
End Date : December, 2007


Description :
The project was implemented by NDRI in partnership with United Nations World Food Programme, (WFP). The main objective of this survey was to conduct a mid term evaluation for the Protracted Relief and Recovery Operation (PRRO) under food security, monitoring, and analysis systems-WFP Nepal.


Mapping of Food Market Catchment Areas

Collaborating Organizations : UN WFP
Team Leader : Prof. Dr. Punya Prasad Regmi
Start Date : May, 2008
End Date : August, 2008


Description :
The project on Mapping Food Market Catchment Areas in partnership with World Food Organization was carried out with the objectives of series of district maps showing the location of markets and direction of commodity flow to different market catchment areas in the districts.


Integrated Community Based Disaster Management in Banke District, Nepal PhaseII

Collaborating Organizations : ICHARM Japan
Team Leader : Dr. Nawa Raj Khatiwada
Start Date : June, 2008
End Date : July, 2008


Description :
The project "Integrated Community Based Disaster Management in Banke District, Nepal PhaseII" was a collaborative with International Centre for Water Hazard and Risk Management-Public Works Research Institute (ICHARM-PWRI), Japan. The duration of the study was 2 months and the field investigation was carried out in Banke district.


Impact of Rising Food Prices and Its Implications in Nepal

Collaborating Organizations : UN WFP
Team Leader : Prof. Dr. Punya Prasad Regmi
Start Date : April, 2008
End Date : August, 2008


Description :
A study on Impact of Rising Food Prices and Its Implications in Nepal in partnership with World Food Organization. The main objectives of the study is magnitude of the recent food price increases and the future outlook in different areas of the country.


Feasibility of a universal child benefit programme for UNICEF

Collaborating Organizations : UNICEF Nepal
Team Leader : Dr. Nawa Raj Khatiwada
Start Date : March, 2008
End Date : June, 2008


Description :
The objective of this study was to strengthen the profile of children at national policy level, to improve the project design and to provide technical support to the Government of Nepal.


Study of prevalence and antimicrobial susceptibility of Salmonella species in poultry carcasses

Collaborating Organizations : IFS
Team Leader : Dr. Nawa Raj Khatiwada
Start Date : February, 2008
End Date : May, 2008


Description :
The main objective of the project was to identify possible risk factors which ultimately help in formulating help in formulating and implementing control measures in farm level. Its also will be useful to evaluate Nepal poultry farmers' level of understanding on different farm management and bio-security measures available to control diseases.


Integrated Community Based Disaster Management in Banke District, Nepal Phase I

Collaborating Organizations : ICHARM Japan
Team Leader : Dr. Nawa Raj Khatiwada
Start Date : August, 2007
End Date : February, 2008


Description :
The study "Integrated Community Based Disaster Management in Banke District, Nepal Phase I". This project is a collaborative with International Centre for Water Hazard and Risk Management-Public Works Research Institute (ICHARM-PWRI), Japan. The duration of the study was 8 months and the field investigation was carried out in Banke district.


Flood hazard Study of West Repti River Basin of Nepal Phase II

Collaborating Organizations : ICHARM Japan
Team Leader : Dr. Laxmi Prasad Devkota
Start Date : August, 2007
End Date : February, 2008


Description :
The baseline study on "Flood hazard Study of West Repti River Basin of Nepal Phase II " was a collaboration with International Centre for Water Hazard and Risk Management-Public Works Research Institute (ICHARM-PWRI), Japan. The duration of the study was of 12 months and the field investigation was carried out in Banke district.